What a Clean Draw Request Looks Like, and Why We Fund It Within 24 Hours

A slow draw can cost you more than the interest. We commit to funding draws within 24 hours. Here are the three things every draw request needs so nothing holds yours up: photos of the finished work, the contractor's invoice, and a lien waiver.

WH

Will Harvey III

Founder, Harvey Capital Funding

An hourglass, a model house wrapped in scaffolding, a tape measure, a clipboard and a phone showing photos on a walnut desk. Harvey Capital Funding.

A slow draw can cost you more than the interest.

When your contractor finishes a phase and the money doesn't show up, the crew moves to another job. Getting them back can take a week or more, and every week the house sits costs you: another week of interest, insurance, utilities and taxes, and another week before you can sell or refinance.

We commit to funding draws within 24 hours. This article is about the other half of that promise: what a draw request needs so nothing holds it up.

How draws work on our renovation loans

When we fund a renovation loan, we don't hand over all of the renovation money at closing. Part of the loan is held back and released in draws as the work gets done. You finish a phase, you ask for the money for that phase, we check it, and we fund it.

That structure is normal for renovation lending. What isn't normal is how long the checking step takes at a lot of lenders. If you're comparing lenders, the draw process is one of the most important questions to ask, and one of the least asked. Our full walkthrough of the process, including the phone walkthrough video that replaced the on-site inspector, is in How We Fund Draws.

The three things every draw request needs

Send these three together and the money moves the next day.

1. Photos of the finished work, matched to your budget

Take photos of the work you're asking us to pay for, and match each one to a line item on your renovation budget. If you're drawing on the roof, the electrical rough-in and the kitchen cabinets, we should be able to look at your budget, look at your photos, and see all three.

Photos that don't match a line item are the most common reason we have to come back with a question. Label them, or name the files by line item, and we won't have to guess.

2. The contractor's invoice for that phase

The invoice tells us what the work cost and who did it. Ask for each amount under the line item the invoice is actually for. If one invoice covers more than one line item, split it so every dollar you ask for lines up with a line on your budget.

3. A lien waiver for the work that's already been paid

A lien waiver is a short signed statement from the contractor saying they've been paid for the work. It matters because a contractor or subcontractor who doesn't get paid can file a mechanic's lien against the house. A lien like that can cloud your title right when you're trying to sell or refinance. The waiver protects your exit as much as it protects our loan.

Why a request waits

A request missing one of the three waits until it's complete. We don't partially review a draw and then wait on the rest, because the whole point is to fund it once, quickly, with everything in hand.

The usual holdups:

  • A missing lien waiver. The work is done and the invoice is in, but nobody asked the contractor to sign the waiver. Get it at the same time you get the invoice.
  • Photos that don't show the line item. A wide shot of a room doesn't show us that the new electrical panel is in. Take the close-up.
  • An invoice that doesn't match the request. If the amount you ask for on a line item is more than the invoice for that line item, we have to ask why.
  • Drawing on work that isn't finished. Draws pay for finished work. Ask for the money when the phase is done, not when it's almost done.

Plan your draws around real phases

The fastest borrowers decide on their draw points before the work starts. Build your renovation budget with clear phases, like demolition, rough-ins, roof, drywall and finishes, so each draw lines up with a stage your contractor can actually finish. Our guide to building a rehab budget that holds walks through how to set that up, and Contractor Bid Red Flags covers what to check before you hire the crew that will be sending those invoices.

Then tell your contractor up front what you'll need from them at every draw: the invoice for the phase and a signed lien waiver. A contractor who knows that on day one sends it with the bill.

Why we work this way

Renovation money is held back for a reason. It makes sure the money goes into the house as the work gets done. But a draw process should do that one job and then get out of the way. A stalled draw stalls the job, and a stalled job costs you money you never planned to spend.

So we keep the checks that matter, the photos, the invoice and the waiver, and we commit to funding a complete request within 24 hours.

Keep your crew on your job. Send clean draws.

Have a renovation project that needs funding? Call us at (804) 208-0465.

Ready to Talk About Your Deal?

Whether you're working on your first flip or your fiftieth, we're happy to walk through the numbers with you. No pressure, no obligation.

Related Articles